L&S America Online   Subscribe
Advertise
Home Lighting Sound AmericaIndustry News Contacts
NewsNews
NewsNews

-Today's News

-Last 7 Days

-Theatre in Review

-Business News + Industry Support

-People News

-Product News

-Subscribe to News

-Subscribe to LSA Mag

-News Archive

-Media Kit

Extra Obstacles for Australian Ninja Warrior

Chameleon Touring Systems supplied gear and crew to Hugh Taranto, in this work with Australian Ninja Warrior

The fourth season of Australian Ninja Warrior heralded a new era with Ninjas coming face to face with mind-blowing new obstacles and for the first time, Ninja versus Ninja on the almighty Power Tower.

Filmed at Melbourne Showgrounds, the show was once again lit by Hugh Taranto with Chameleon Touring Systems supplying gear and crew. For the first time, Taranto had house power instead of generators and he relished working on a site set up for production.

Of course, COVID-19 reared its ugly head just as filming started but thorough planning and advice saw the production through. Being able to continue filming without an audience as well as outdoors, certainly helped.

"We were there for three weeks setting up and just as we were about to start recording, Covid-19 started to happen," Taranto says. "There was a lot of making changes on the run. We started with a full audience but that was soon changed to just family and friends. As time went on and rules and protocols kept changing, we ended up with no audience towards the end. We were fortunate to be able to push through and finish the show."

New this year was a fresh obstacle called the Power Tower, a large circular obstacle that was the last challenge and rather tricky to light. The structure was internally lit with Chauvet Colordash IP LED PARs and a ring of EK Collider Strobes sat around the top ring, 12m in the air.

"As well as being internally lit, there were light-up poles that the Ninjas would grab onto," says Hugh. "As they got to each pole they would light up in a different color. We also hid QIs in the stairs leading up to the obstacle and the rest of the lighting came from surrounding scaffold positions."

As the show is held outdoors in the ever-changing Melbourne weather, Chameleon IP-rated fixtures were kept busy especially the 18 Prolights Panorama Wash FX and 12 Beam IP-rated fixtures which were located in the set as the primary movers. Added to that were six Martin MAC Vipers with rain hats.

"The Panoramas were a fantastic addition," mentions Hugh. "We used the beams on Mt Midoriama and the washes were used around the course. In previous seasons we used indoor fixtures in these positions with rain protection and the IP rated lights allowed for a much better looking and useful solution. As well as the pixel FX in the Washes that we could use on the front face of the unit as eye-candy, they were extremely powerful as a wash light."

As in previous years, the LED fixture count was massive; with so much visible shiny trussing, ShowPRO TrussMates were a must and a whopping 324 were installed.

"They sit in simple waterproofing and do the top chords of the truss structures," adds Taranto. "The uprights of the truss are lit by 84 x Chauvet QUAD Zoom LED Par which not only cop a lot of water from the rain but also get soaked from the Ninjas falling in the water. Inside the base of the obstacle trusses are 164 x Chauvet Colordash IP LED PARs with some also used to truss tone the trusses behind the audience. A total of 28 x LED IP MiniNova PARs were on the trusses at the bottom of the audience where we needed a little bit more control which the zoom feature helped us achieve."

Lighting up Mt Midoriyama in a deluge of color were 32 x ShowPRO EX36 LED Floods located within the mountain to internally light the scaffolding. There were another 48 units around the course lighting scaffold and walls. Twelve EK Collider FC Strobes were placed around the outside of Mt Midoriyama from where they could accentuate the shape of the structure.

Also in Mt Midoriyama were 96 x Martin VDO Sceptron10 that go up and down the internal structure creating an impression of upwards movement as the competitors climb. A total of 96 x ShowPRO Quad LED IP Strips are scattered over the set. They help accent the movement as Ninjas advance through the course with some used within the Chimney Climb for a sense of vertical movement.

Twelve little ShowPRO Hercules battery LEDs were on hand to be thrown into unforeseen situations.

"With the Hercules, we didn't have to worry about where we'd power and data them from, we can just throw them in and instantly they are part of the show," adds Taranto.

This year, Taranto was asked to add some extra lighting interest into some of the obstacles and he did this by adding 56 x ShowPRO DreamPix Strips IP65 creating extra color and movement to the course.

A key look to the show were the ShowPRO PixPads with 44 deployed around the site. Taranto comments that they required little waterproofing, with Chameleon designing a custom solution to protect the electronics at the back of the fixture and the front face happily taking all weather.

"The site has a huge amount of lights but within a few fixture types so we were able to repeat looks around the course," says Taranto. "So no matter where you are on the course, it's instantly recognizable where you are. There will always be PixPads and Panorama Washes in the background."

Also in the rig were eight Panther searchlights, two Dominators, 68 x underwater LEDs, and an LED Soft Panel for the roving commentator.

However, the main light source on the set is the humble PAR can with almost 500 in play lighting the actual action and audience.

"As there's so much structure and apparatus around the Ninjas, we decided to bring lights in close to them by mounting PARs on the apparatus itself," explains Taranto. "We needed something fairly robust, weatherproof and able to take a lot of vibration punishment. Also, the silver PAR can enhance the look of the set with its' silver truss set up."

Added to the vast amounts of PARs, were six 2K Fresnels, 12 x ETC S4 14deg Profile, 36 x Source 4 Pars, six 1k Fresnel, 32 x 500w QI, 10 x 1500W QI, and one Robert Juliat Victor follow spot in case a Ninja claimed Mt Midoryami -- and this year for the first time one did!

Atmosphere was provided by four JEM ZR 44 smoke machines and four Unique Hazers.

When the audience was removed from filming Taranto was allowed to fill the audience bleachers with extra set pieces and lighting including 20 additional ProLights Panorama Beams, four ProLights Panorama Washes, 24 x Collider Strobes, and 30 x HEX LED Pars.

Control was a couple of MA Lighting MA2 light, one run by Chad Spencer for the moving lights and LED fixtures and the other by Taranto for the white light and Catalyst screens.

Distributed dimming and data systems were located within tents around the course, with fiber run to each of them where NPUs then distributed the data around.

"It's a long build for this show although running the show itself is fairly simple as it's a repetitive set up for us," concludes Taranto. "We have a bit of a template and as I said, we use the same lights in the same sort of places. The setup period is huge and the lighting alone takes a couple of weeks. The shooting period is then another three weeks."

Hugh Taranto - Lighting designer
Chad Spencer - Lighting director / console operator
Matt Sculley - Lighting assist
Luke Cuthbertson - Chameleon account manger
Alex Celi - Chameleon project manager
Alex McCoy - Chameleon LX show crew
Chris Masters - Chameleon LX show crew
Taylor Lawson - Chameleon LX show crew
David Goldsztein- Chameleon LX show crew

WWWwww.chameleon-touring.com.au


(8 October 2020)

E-mail this story to a friendE-mail this story to a friend

LSA Goes Digital - Check It Out!

  Follow us on Twitter  Follow us on Facebook

LSA PLASA Focus